Home :: Register :: Login
Album list :: Last uploads :: Last comments :: Most viewed :: Top rated :: My Favorites :: Search

Most viewed
inside_bits_011.JPG
190 views
Mouse_Pram.jpg
the dream181 views
Mouse_Pram_Set-up_006.JPG
The Set-up 1176 viewsI chose Iain Oughtred's Mouse Pram because of it's size and simplicity, as well as it's sweet lines. For a pram, this little boat really looks great. It is quite similar to Joel White's Nutshell Pram design, but the construction is better planned out.
planking_done_012.JPG
162 views
planking_done_003.JPG
161 views
planking_done_010.JPG
158 views
planking_done_001.JPG
152 views
inside_bits_006.JPG
151 views
The_Garboard_001.JPG
The use of plywood clamps and wedges144 views
planking_done_009.JPG
141 views
inside_bits_005.JPG
forward knees138 views
planking_done_004.JPG
135 views
inside_bits_003.JPG
close up of aft quarter knee. cherry133 viewsNote the direction of the grain.
planking_done_006.JPG
131 views
planking_done_007.JPG
The starboard gunwale131 views
FEB_22_019.JPG
129 views
Gluing_up_the_feature_strip.JPG
Gluing up the feature strip128 viewsOver 60 individual pieces. Roughly 4-5 hours of labor just to make a neat accent on the canoe.
second_strake_and_skeg_004.JPG
The second strake125 views
Mouse_Pram_Set-up_008.JPG
The set-up 2124 viewsNote the batten across the top. Very nice curve.
Garboards_installed_007.JPG
Garboards installed.123 views
The_Garboard_004.JPG
Installation of the Garboard complete123 views
FEB_22_012.JPG
port-side 2nd strake installed122 views
FEB_22_018.JPG
close-up of clamps, wedges and epoxy fillet122 views
007~1.JPG
121 views
Another_view_of_the_feature_strip_installed.JPG
Another view of the feature strip installed121 views
kids_and_mouse_pram_035.JPG
121 views
Making_the_strips.JPG
Making the strips121 viewsI estimate that it takes about 4 minutes per strip. First, the 1X10 is planed down to an even thickness, then ripped into about 25 strips that are 1/16" too big (on purpose). Then I plane those down to exactly 1/4". After that, each 12' strip gets a bead on one edge and a cove on the other. Labor!
Garboards_installed_006.JPG
Garboards installed120 views
kids_and_mouse_pram_036.JPG
119 views
kids_and_mouse_pram_037.JPG
119 views
FEB_22_010.JPG
The standard view from "above" (i.e. a chair)118 views
second_strake_and_skeg_005.JPG
The cherry skeg118 views
kids_and_mouse_pram_038.JPG
117 views
021.JPG
She's going to be pretty.115 views
Clamping_the_second_strip.JPG
Clamping the second strip115 viewsThe more clamps the better. I use about 40 clamps per strip.
FEB_22_022.JPG
clamping the portside sheerstrake115 views
006.JPG
114 views
Bungees_hold_the_stem_in_place_during_glue_up.jpg
1Bungees hold the stem in place during glue up.114 views
My_daughter_Emily_with_the_paddle.JPG
My daughter Emily with the paddle.114 viewsThis is a demonstration of how light the paddle is. It is made of primarily spruce, with walnut and birch for the accents.
FEB_22_003.JPG
bilge runners. difficult to clamp113 views
158 files on 4 page(s) 1